New Office Nearing Completion

Two years ago (before the Modwest Blog was born), we started thinking about moving to different office space in downtown Missoula. Our current space was and is functional and decent, and we love the location on the third floor at the center of downtown, but we were interested in something bigger, more comfortable, and snazzier.  We were doing a fair bit of web design back then, and so having a really nice space to conduct client meetings was another goal.

Now that the move to our new space is just a few weeks away, it's incredible to think back on all the things that needed to happen in order to make this possible.

It started with a fortuitously random Missoula sidewalk introduction more than a year ago. My friend Rochelle introduced me to Bret, who later introduced us to Rick and Justin who had recently purchased the Wilma. We worked over several weeks with Rick and Justin to figure out the space we needed, right alongside Caras Park.

As global financial markets began to shudder and shake this spring, arranging the financing wasn't exactly trivial. The first step was to identify what exactly we'd be doing with the space in terms of remodeling, because the bank wanted to know what their collateral was going to look like. So that meant detailed space planning, including specifics of the interior design.

Identifying our requirements was sort of hard. We found ourselves saying things like "well, we want to be connected and open to facilitate communication, and we all want some privacy too". We asked everyone to help us to identify other desires, and collaboratively generated a long ranked list, including:

  • Full-sized Kitchen
  • Nice conference room
  • Separate casual meeting room
  • Workshop for server testing and repairs
  • Concealed network closet
  • Good Natural Lighting
  • Decompression Lounge
  • Self-cleaning kitchen
  • Kegerator
  • Bike Lockers
  • Solid Flooring
  • Shower
  • Sleeping Tubes

Sleeping Tubes?  No, we didn't up installing sleeping tubes, but the process of generating the list together was helpful and informative, and we did our best to accommodate as many good ideas as we could.

It took several months to get it all sorted out with an architect, interior designer, and a professional project manager, before a single hammer was swung.

Last time we shared a photo of the space shortly after demolition had begun.

I gave my wife a tour yesterday, so here's a few more pics now that the remodel is nearly complete.

Front




























Down

Side

Moving Day is Oct 24th. We can't wait!

-JM

TrackBack

TrackBack URL for this entry:
http://www.typepad.com/services/trackback/6a00d8341c263353ef010535137d3e970b

Listed below are links to weblogs that reference New Office Nearing Completion:

Comments

Do we get a free tour included with our monthly hosting fee? :)

@eferrini: Absolutely!

We'll have an open house in December as well.

Verify your Comment

Previewing your Comment

This is only a preview. Your comment has not yet been posted.

Working...
Your comment could not be posted. Error type:
Your comment has been posted. Post another comment

The letters and numbers you entered did not match the image. Please try again.

As a final step before posting your comment, enter the letters and numbers you see in the image below. This prevents automated programs from posting comments.

Having trouble reading this image? View an alternate.

Working...

Post a comment

June 2009

Sun Mon Tue Wed Thu Fri Sat
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30        

Modwest.com >>
Modwest System Status >>